bayu taufik hidayah

2101763504
Judul Skripsi PLANNING OF TOTAL PRODUCTIVE MAINTENANCE (TPM) IN X-11 COILED TUBING EQUIPMENT IN OIL AND GAS INDUSTRY USING OVERALL EQUIPMENT EFFECTIVENESS METHOD (CASE STUDY: PT. BPN)
No photo at the moment
No video at the moment