ENGINEERING PRACTICE REPORT TITLE TIME AND COST PERFORMANCE ANALYSIS USING EARNED VALUE MANAGEMENT (EVM) FOR A GRID-CONNECTED ROOFTOP SOLAR POWER PLANT PROJECT WITH A CAPACITY OF 3,689.28 KWP AT PT X KARAWANG AS THE EPC CONTRACTOR